Thursday, February 28, 2013

Day 10 February 24

While it was Sunday and David wasn’t working, we got less done than anticipated due to our church attendance and a trip to Lowe’s for necessary supplies for the day’s tasks. With the wall built, lights mounted, and plumbing planned, our next task was initiating rerouting of plumbing. With David’s plans from the previous day, we began our pipe cleanse. Again, ‘we’ looking like David doing most of the cutting and soldering and me holding an occasional pipe from falling to the floor or hitting a wall.


There was a slight set back when David cut a pipe in the wrong spot, but it was quickly fixed after two runs to our local hardware store (failure to pick up the right piece the first time led to the second trip). The positive piece to all the excess plumbing was that instead of cutting all the lines, David was able to heat most of the joints and remove the pieces to use for the additional lines being installed. By the end of the night, all the plumbing we wouldn’t be using was removed or capped, and the left over pipe was ready to be used for the next day’s designs.

No comments:

Post a Comment