Such a
productive day!! Well at least it felt like that because we finally got around
to the large pile of insulation in the middle of the space! Actually it WAS
pretty productive because Paul and Mark got to work on our new HVAC unit! I
didn’t get a picture but wish I would have of the mess it was in here. What
little space there was to walk in was now occupied by all their tools and
ducting. It was pretty humorous. But they seemed to get quite a bit accomplished
for day one. They started installing the duct in the loft and the small bit in
the downstairs bedroom closet, as well as bringing the new unit inside.
They left
before David came home, but you can be sure as soon as he walked in the door he
was doing his rounds to check out their work. He seemed pretty impressed :o)
After he mentally OK’d their work, we got to finishing wiring the 3-ways for
the recessed kitchen lights. It was quick work and before we knew it we had
lights! That dimmed!! I was pumped. Since both walls that the boxes are on have
drywall, David was able to shove the mess of wire into the box and close them
up. Oh I’m gettin’ giddy!!
Next was to connect the wires for the range in the
junction box. We used some fancy clamps (I’m sure they’re not fancy but they
were new and shiny !) to connect heavy gauge wires together. I stripped the
wires and clamped them together, David checked the tightness and then wrapped
them with electrical tape and closed her up. Then it got exciting…