Thursday, March 21, 2013

Day 34 March 20


It was a bit of an eclectic day for me. It started with adding a little insulation to spots we were still working in but have now wrapped up and needed some before we put up the drywall. Then came a seek-and-find-the-hidden-junction-boxes in our basement wall. The previous owners really did love those hidden junction boxes. One of them we’ll keep but David will do something to make it accessible, whereas the second one got removed. It had wiring for a couple of baseboard heaters that we aren’t using anymore so bye bye! Then I added a sliver of drywall in the mudroom in the corner, as well as the cut out the part of the wall David had to remove to get to the three switches by the door. That was fun since it was an oblong piece. I cut it to size and removed the outlets to set up for David to use his dremel when the piece goes up. And then it got crazy because…
THE CABINETS CAME!!!! I guess it would be even more exciting if we were ready to install them but hey, I was still pumped. Two guys in their truck rolled up and unloaded 25 boxes into our garage, now patiently waiting to be stripped from their cardboard walls and put into our kitchen :o)
   
I left before David came home but came back to him slopped in mud. Well not really, but he did get started working on the seams. The videos we watched online make it look so much easier and fast. Damn professionals and their false skill they instill in us. 

No comments:

Post a Comment